BOOT
SINOMA EC International Investment Ltd. has flexible and various business model, till now has invested more than 21 WHR projects in China and abroad. It owns mature BOOT/EMC financial mode, rich investment experience, professional operation team and convenient carbon sink trading platform.
Client Benefits from BOOT WHR of Cement Plants
Unit price difference for each kwh means the difference between Buying Grid Electricity Cost and Buying BOOT WHR Electricity Cost per kwh, we could define it as “A”. Sinoma internal control figure over WHR supplied power price is between 5-10% lower than the grid power price.
Client doesn’t need concern the project financing works, construction works, operation & maintenance works, all of which will be in BOOT Provider’s scope.
Considering 7500 operating hours/y.
Assuming 400kg/MWh CO2 emission (EU average). If CTS is available in local, then the benefits of which could also be discussed and shared by both sides.
SINOMA Internal Risk Control & Project Execution
To secure Sinoma’s investment earnings, we need to lock the kiln availability or total power generation during the entire cooperation period. We will propose two options:
Option 1: regulate the kiln availability in the contract shall be more than 80% (minimum);
Option 2: regulate the target power generation during the whole agreed commercial operation period (normally 15 years, which could be discussed later).
If the availability or target power generation are not achieved attributable to Client, then corresponding compensation will be made to investor, details could be discussed mutually.
Project Execution:
About the BOOT/BOO project execution, we will adopt EP+C mode. C part we will hand over to the local contractors to execute to avoid any potential troubles, increasing local employment rate and the social benefits.